Waterloo, Central London
Renovation of a large property
A full plumbing and heating project.



Real installations from our customers' homes: case studies from Bushey and Hertfordshire with their real figures, and heating and plumbing projects across London.

Case study · Bushey
A 12 kW Vaillant aroTHERM plus heat pump we installed in Bushey, Hertfordshire. The lower the flow temperature, the less hard a heat pump has to work.
Figures so far, with updates to follow.
“Our installer has assured and reassured us that he will provide remote and in person support to ensure that we achieve a comfortable temperature throughout our home.”

Case study · Hertfordshire
A full renovation of a 5 bedroom, 4 bathroom house with two 25 kW Vaillant heat-only boilers. The house was extended to 7 bedrooms and 8 bathrooms in total.
A full renovation was underway, and the contractor contacted us because previous quotes suggested installing another boiler, to bring the property's capacity up to 65 kW.
One of the two boilers was quite new. Asked how it had been sized, the previous engineer said the old one had broken, so it was replaced with one of the same output.
After a discussion with the client about the building's age and materials, Kirk did a heat loss survey and got 24.5 kW. He redid it and got the same figure, then commissioned an independent survey, which came to 27.5 kW. He isolated one of the boilers, and a couple of weeks later he could show the client the replacement boiler hadn't been needed: the system simply needed re-piping for one boiler.
Before the work, there was no balanced water supply or comfortable heating.
The extended house ended up back at 24.5 kW, the figure our original survey gave, and around 40 kW below the capacity previous quotes proposed. The client has since reported cost savings and the best hot water ever, despite having more bathrooms.
“This project has been my most challenging and enjoyable to date.”
What the client said

Kirk Ferguson of NuRenewables Heating is the most knowledgeable heating engineer/plumber I have ever used and performed an absolutely superb job reworking how my entire heating and hot water system was configured for a large extension. This included installing a new boiler, powertank (to improve the water pressure), hot water cylinder, 3 bathrooms and a kitchen amongst other works.
Kirk is a delight to have in the house, is super tidy, but most of all is an expert in his field and applies a scientific approach to his installations to maximise the efficiency for the homeowner.







Case study · Hertfordshire
A large property: 6 bedrooms with 5 bathrooms. The property has 5 heating zones, as the client requested.
A Viessmann Vitodens 100-W system boiler was installed with full weather compensation, for 18.8 kW at an outside design temperature of -3°C. A Viessmann 4 pipe system is used with a 300 litre unvented cylinder, giving priority hot water to the client's five bathrooms and large family while maintaining efficiency.



More projects
A few of our recent jobs, with photos from each.
Waterloo, Central London
A full plumbing and heating project.



Richmond upon Thames



North London



In progress · London
One of our current London new-build projects features a highly insulated envelope, substantial lower-ground construction and thermal mass, with a calculated design heat loss of approximately 4.2 kW.
The heating design uses predominantly open-loop underfloor heating, carefully balanced circuits, appropriate system water volume and weather-compensated control. After commissioning, OpenEnergyMonitor Level 3 and temporary wireless room-temperature sensors will be used to assess energy performance and room response.
“Good engineering means calculating carefully, selecting appropriately, then measuring and refining for real-world comfort.”
This anonymous case study describes design intent and planned monitoring, not verified post-installation results.
Read Kirk's write-upOur work
Heat pumps, boilers, plant rooms, pipework and underfloor heating, each photo from one of our installs.
Heat pump plant roomUnvented hot water cylinder, a second tank and expansion vessel, with copper pipework.
Photo by photo









Google reviews

Kirk is a master, he helped me to decide which heat pump was suitable for my property,
He take care of everything from the start to the end of the job.
I very impressed of his knowledge. Very recommend.

Kirk is a fantastic heating engineer, who ensures they deliver the right solution for each house, and has gone the extra mile for us to improve the heating and water quality in our house.

Exceptional service every time.
Clean and tidy after. Will recommend this company
Contact
Send a few details and we'll get back to you to talk it through.
We'll be in touch to talk through your home and what you need.